Government approval to build the Aviemore dam and hydro station was granted in October 1962. Together with Benmore and Waitaki, it forms the mid-Waitaki Power Scheme.
The first concrete for the dam was poured in August 1964, with the largest single pour taking three days. Two shifts of more than 40 men toiled to raise the dam from foundation level to an impressive height of 58 metres.
Aviemore dam has the largest penstocks in New Zealand – an impressive seven metres in diameter. (A penstock is a pipe that carries water into a power station.)
Key dates
- 1962 – Construction begins
- 1968 – Aviemore fully operational