We’re getting ready to roll out a brand new experience! Keep an eye out for our emails as we’ll notify you when your new account is ready to use in the app! In the meantime, please use our website to log in and manage your account. Got questions about your new account? View our FAQ
Needing to reconnect the power at your site? Here's what you need to know to get power back up and running.
What's a reconnection?
A reconnection is needed when you need power and your property is currently disconnected, but the electricity supply is already set up on site.
What you need to do to reconnect
If your site is currently disconnected but the electricity supply is already set up, here’s what you need to do:
Before you contact us:
If the site has been disconnected for 6 months or more, you’ll need a Certificate of Verification (COV) from a licensed electrical inspector
Make sure themain switch is turned on
Beat the siteand ready to stay until the power is back on
Have your account and/or ICP numberready
A remote reconnection won’t be possible if:
The main switch is off at the property
There’s no smart meter installed
The site has been disconnected for 6 months or more
In these cases, we’ll send acontractor to physically reconnect the power. If a Certificate of Verification (COV) is required, this must be made available to our contractor when they arrive.
Important: You need to be authorised on the Meridian account and at least 18 years old to request a reconnection. Contractors may not call before arriving. They will not reconnect if someone is not on site.
Timeframes and fees
Remote reconnections: usually within 30 minutes
Physical reconnections: usually within 4 hours (urban) or 6 hours (rural)
Urgent physical reconnections: usually within 2 hours (urban) or 4 hours (rural)
Note: The fees above are those charged by Meridian. Additional charges may apply from your network provider or other contractors - they will discuss these with you directly.